Salaam City · Phase 1, Lot 1ADashboard

Dashboard

At a glance

Health and safety

Work areas

Batches by task

Skeleton works against the programme

Documents

Open documents by age

Days since raised, by who owes the answer

Drop files here, or click to choose PDF and images, up to 12 pages a file. Word files need saving as PDF first.

No records yet?

The demo project loads three weeks of batch graduation across four blocks, with infrastructure and site mobilization and enabling works, documents, actions, procurement and a closed period. It replaces everything currently held.

Add a procurement item

Risk is computed from the lead time against the date the item is required on site, so both are needed for the item to be reportable. Long-lead items are the only thing on this project that cannot be recovered inside a week.

What is needed
Dates that decide the risk
Who is chasing it
Pack details
Snapshot
Narrative sheets

Close a period

Freezing a period fixes its figures and copies the documents overdue at close, so the next one can report what happened to them.

Turnaround

The basis changes every days-late figure and every status on the register, so it is a contract question rather than a display setting.

Work areas

The daily record, documents and risks share the same three work areas.

Residential batches

Which block each batch sits in and the houses it holds. Progress is logged against the batch, so it moves with any change here. A batch with logged work cannot be removed.

Data

Download with data gives one HTML file: the app with the whole record and uploaded files (up to 25 MB) inside. Open it in any browser to carry on from where you are. The backup is a readable JSON file of the records only.

Add records kept elsewhere

Records saved in a browser that was not connected to the database, or held in a backup file, can be added here. Only records the database does not already hold are listed; nothing already in it is replaced. Pick the ones to add.